New Lathe
I bought a 1949 South Bend 9" lathe. It came with a cool but large and heavy (400-500lbs) stand built by the previous owner. We couldn't figure out a way to get it into my basement until the seller thought of hiring a friend with this very useful knuckle crane.
The crane carried threaded the lathe and stand through my back yard, rolled it down a ramp into my basement, and delivered the package into my basement doorway.
This is a photo of the old lathe sitting on top of the new lathe just to give a size comparsion. The old lathe could turn material up to 14" long, the new one has a 36" bed. The new one is much more rigid and can take much deeper cuts in material.
The stand that I bought with the lathe is very nice. It has a large stock rack on the back for holding metal, 9 drawers for holding tooling, and an open area below for larger items.